The only requirement is that there be at least one SWPPP for a site that incorporates the required elements for all operators, but there can be separate plans if individual operators so desire. With respect to when an inspection would be required for operators conducting inspections after a 0.25 inch storm event if the rain volume threshold is reached on a non-working day, it was EPAs intention that the inspection be conducted on the next work day. Data Management. B. The permit requires operators of linear construction sites to retain as much natural buffer as feasible, and/or to the extent feasible provide supplemental erosion and sediment controls in the buffer area. The Code of Maryland Regulations (COMAR) 26.17.01 was promulgated to protect valued natural resources Stabilization requirements are found in the 2011 Maryland Standards and Specifications for Soil Erosion and Sediment Control. The "common plan" of development or sale is broadly defined as any announcement or piece of documentation (including a sign, public notice or hearing, sales pitch, advertisement, drawing, permit application, zoning request, computer design, etc.) 0000010677 00000 n A sediment-related parameter is an indicator pollutant used to measure sediment pollution, such as total suspended solids (TSS) or turbidity. Property stabilization or stabilized occupancy is a projected range of occupancy for rental property. If someone files a lawsuit against you, it will also help to cover your legal fees. Hire a home inspector who can help you find signs of potential sinkhole activity. A principal executive officer of a federal agency includes (i) the chief executive officer of the agency, or (ii) a senior executive officer having responsibility for the overall operations of a principal geographic unit of the agency (e.g., Regional Administrator of EPA). Impervious surfaces include rooftops, decks, sidewalks, patios, swimming pools, driveways or other similar surfaces. trailer <]/Prev 148253/XRefStm 1415>> startxref 0 %%EOF 894 0 obj <>stream You are probably not an operator, and therefore are not responsible for submitting an NOI to be covered under the EPA CGP, if: You are a subcontractor hired by, and under the supervision of, the owner or a general contractor (i.e., if the general contractor directs your activities on-site, you probably are not an operator); or. WebCOVERAGE A DWELLING We cover: 1. the dwelling on the residence premises shown in your Policy Declarations used principally as a private residence, including structures A number of structural controls (mulching, use of inlet protection, or silt fence) and non-structural controls (minimizing disturbance, good housekeeping) have been shown to be efficient, cost effective, and versatile for small construction site operators to implement. 0000035214 00000 n If you wish to obtain a waiver from submitting a report electronically, you must submit a request to the EPA Regional Office. 0000020134 00000 n The buffer requirements also apply to areas in the 50-foot buffer where natural vegetation is limited or nonexistent (e.g., rocky or sandy areas) and that are otherwise not occupied by preexisting development disturbances. What is Property Stabilization? APPENDICES -- BASIC PERFORMANCE STANDARDS If your smaller project is part of a larger common plan of development or sale that collectively will disturb one or more acres (e.g., you are building on 6 half-acre residential lots in a 10-acre development or are putting in a fast food restaurant on a 3/4-acre pad that is part of a 20-acre retail center) then you need permit coverage. No. For example, if you are building homes on multiple lots as part of a larger residential subdivision development, you can submit one NOI to cover all of your lots, even if they are on opposite sides of the development. Operators are not required to provide or document formal training for subcontractors or other outside service providers, but operators must ensure that such personnel understand any requirements of the permit that may be affected by the work they are subcontracted to perform. Vegetation intercepts rain, reducing its energy and preventing splash erosion. Chinas population reached its peak size in 2022 and has begun to decline, Mr. Wilmoth told a press The following examples qualify as limiting disturbances at any one time to 5 acres or less: The total area of disturbance for a project is 5 acres or less. Yes. Official websites use .gov As is the case with large construction sites, erosion and sediment control at small construction sites is best accomplished with proper planning, installation, and maintenance of controls. The certifier of the NOI for the EPA CGP (i.e., the person who must sign the NOI form before it is submitted to EPA) must, in accordance with 40 CFR 122.22, be one of the following: For a corporation: A responsible corporate officer, which means: (i) a president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy- or decision-making functions for the corporation, or (ii) the manager of one or more manufacturing, production, or operating facilities, provided, the manager is authorized to make management decisions which govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures to assure long term environmental compliance with environmental laws and regulations; the manager can ensure that the necessary systems are established or actions taken to gather complete and accurate information for permit application requirements; and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures.